71                       ANALYSIS RETAINING WALL WITH BORED PILE (CASE STUDY TOWER PLN SUTT 150KV NO.71 AT JALAN GATOT SUBROTO BARAT DENPASAR)     ! " #   $%&’ *Email : ngurah.dharmayasa@gmail.com Program Studi Teknik Sipil, Fakultas Teknik dan Informatika, Universitas Pendidikan Nasional (Undiknas), Denpasar  — Di daerah Jalan Gatot Subroto Barat, Denpasar terjadi permasalahan yang terjadi di daerah ini adalah tower PLN SUTT 150 kV no.71 menghalangi jalan masuk ke lahan milik warga, sehingga harus melakukan rekayasa DPT dengan memotong sebagian tanah timbunan serta DPT tipe gravitasi yang telah ada sebelumnya tanpa mengurangi keamanan konstruksi tower SUTT dan mengganti dengan DPT dari tiang bor ( ). Setelah melakukan penyelidikan tanah dan diuji di laboratorium dihasilkan nilai sudut geser tanah (ϕ) = 30º dan berat volume (γ) = 1,6 gr/cm 3 . Berdasarkan analisis pada DPT diperoleh nilai momen maksimum (M maks) = 2.384,248 kg.m dan gaya geser maksimum (D maks) = 1.098,952 kg. Hasil perhitungan DPT dari susunan tiang bor beton bertulang dengan diameter 40 cm diperoleh kedalaman pemancangan 4,5 m dan tinggi DPT 3,5 m diatas tanah, sehingga dibutuhkan tiang bor ( ) dengan panjang 8 m sebanyak 35 buah. Tiang bor ( ) diameter 40 cm menggunakan tulangan longitudinal 6D16 dan tulangan geser menggunakan tulangan Ø10H250. Luas lahan baru yang didapatkan akibat pengurangan eksisting di bagian utara (depan) diperoleh lahan sebesar 5,0 x 11,7 m 2 dan jalan akses di bagian timur dari 2,5 m menjadi 3,9 m.  dinding penahan tanah, tower SUTT,  .  — In area Jalan Gatot Subroto Barat, Denpasar there is a problem when the tower PLN SUTT 150 kV no.71 blocking the entrance to the land belonging to the people, so it must be modified of retaining wall by cutting a portion of the soil embankment and existing gravity retaining wall without decreasing safety SUTT tower construction, and replace by bored pile retaing wall. After investigating the soil and tested in the laboratory generated angle of friction (ϕ) = 30º and density (γ) = 1.6 g/cm 3 . Based on the analysis obtained the maximum moment (M max) = 2,384.248 kg m and maximum shear force (D max) = 1,098.952 kg. Retaining wall calculation results the composition of bored pile of reinforced concrete with a diameter of 40 cm was installed in the ground 4.5 m and height 3.5 m above the ground, so it takes a bored piled with 8 m long by 35 pieces. Bored piled with diameter 40 cm using 6D16 main longitudinal reinforcement and shear reinforcement using Ø10H250. The new land area obtained as a result of the reduction of existing retaining wall in the north (front side) is 5.0 x 11.7 m 2 and access roads in the eastern part wider from 2.5 m to 3.9 m. retaining wall, tower SUTT, bored pile.   Pemenuhan kebutuhan terhadap listrik dalam kehidupan sekarang sangat tinggi. Untuk memenuhi kebutuhan listrik di masyarakat PLN memerlukan jaringan yang mampu menjangkau ke seluruh wilayah yang memerlukan tenaga listrik. Jaringan untuk mendistribusikan listrik ke masyarakat sangat kompleks karena jumlah pelanggan yang harus dilayani sangat banyak. Jaringan PLN tersebut berupa jaringan bawah tanah dan tiangHtiang serta tower oleh PLN. Bangunan tiangHtiang dan towerHtower tersebut sering menimbulkan masalah dalam penggunaan lahan karena memerlukan tempat yang cukup luas. Masalah penggunaaan lahan ini banyak timbul di Vol. 12 No. 2 (2016) Hal. 71-78 p-ISSN 1858-3075 | e-ISSN 2527-6131