Open Journal of Business and Management, 2022, 10, 2959-2973
https://www.scirp.org/journal/ojbm
ISSN Online: 2329-3292
ISSN Print: 2329-3284
DOI: 10.4236/ojbm.2022.106146 Nov. 4, 2022 2959 Open Journal of Business and Management
Multi Structures-Scales (MSS) in Project
Execution Management (PEM)
Roberto S. Ybañez
1
, Arvin R. De La Cruz
2
1
PUPOUS-DENG, Polytechnic University of the Philippines (PUP), Sta. Mesa, Manila, Philippines
2
Graduate School, Polytechnic University of the Philippines (PUP), Sta. Mesa, Manila, Philippines
Abstract
This research study focuses on project organization structure, multi-tasking,
issues, challenges, and limitations that occur during the project execution for
a conventional and virtual team. This research aims to understand the im-
portance of the technical labor force in the organization and fill the human
resources gap in project engineering, construction, and management imple-
mentation. The project is unique and must be dealt with highly technical by
the project team. Projects might be the same structure and scale but in dif-
ferent conditions, parameters, and requirements. In general, dealing with and
executing other projects is challenging. The design guidelines are formatted,
although not entirely the same. The process model uses model-based opti-
mization to compare the conventional and virtual MSS organizational struc-
tures to optimize, innovate, and multi-tasking project staff, personnel, and
direct technical members. The study will include the importance of global
virtual teams (GVT) and the contribution of software collaboration, includ-
ing cloud-based software (CBS). Multi structures-scales (MSS) concept can be
a diversified, optimized, and innovative way to increase team effectiveness,
technical dependence, and utilize existing resources. It uses organizational
productivity and the individual living of project team members. However,
even though the MSS concept seeks to lower the labor cost and reduce indi-
vidual participation, the labor issue, technical workforce, challenges, disputes,
and other problems are not inevitable. As a result, in this implementation, the
corporate organization will solidify the project team structure into mul-
ti-project execution even to long-term employment and operation. The PE/S
can perform simultaneously in different stages of the same type of project. In
contrast, a PM can perform additional steps even on other kinds of projects.
Furthermore, in the study, PS and PM can effectively function if not more
than three (3) projects; otherwise, low-performance evaluation and low-quality
product results occur. In this regard, further study and research related to this
How to cite this paper: Ybañez, R. S., &
De La Cruz, A. R. (2022). Multi Structures-
Scales (MSS) in Project Execution Manage-
ment (PEM). Open Journal of Business and
Management, 10, 2959-2973.
https://doi.org/10.4236/ojbm.2022.106146
Received: June 15, 2022
Accepted: November 1, 2022
Published: November 4, 2022
Copyright © 2022 by author(s) and
Scientific Research Publishing Inc.
This work is licensed under the Creative
Commons Attribution International
License (CC BY 4.0).
http://creativecommons.org/licenses/by/4.0/
Open Access