International Journal of Research in Engineering, Science and Management Volume-3, Issue-10, October-2020 https://www.ijresm.com | ISSN (Online): 2581-5792 | RESAIM Publishing 127 Abstract: The conventional practices being followed in construction industry have lower productivity and lot of delays due to miscommunication and mismanagement between involved parties which are, AECO and investors; which results as loss in economy, time as well as resource wastage. With implementation of 5D BIM, before and during execution phase of construction project, scrupulous management, reduction of the delay in activities as well as wastage of resources; also achieving economy became pragmatic and attainable. This study focuses on the probable of application areas of BIM technology in construction field. Based on few recent research papers, study aims at exploring the various application areas in BIM technology. Keywords: 5D BIM, Application, BIM, CAD, Civil engineering, Review. 1. Introduction BIM stands for Building Information Modelling. To understand it in simple words, BIM technology is where stakeholders in various disciplines collaborate together and work in synchronize with each other in real time to prepare and share the information necessary. This data and information can be utilized to plan, operate and monitor the ongoing project progress. BIM started getting popular during 1990 and since then it has only evolved to make projects much more standardized. Few common benefits of BIM are visualization, simulation, cost estimating, construction sequencing, collaboration between multiple stakeholders, better overall design due to overall collaboration, clash detection, Facility management, better service to client and customer, easy to generate fabrication drawings and with 5D BIM we can generate simulation. This study aims at doing literature survey and exploring other application of BIM. 2. Study of Literature Review for Unconventional Applications of BIM Technology A. Xue Li, Jing Xub, Qun Zhang (2017), guides us regarding their major concerns observed such as insufficient planning during initial stage, logical errors in plan, incompetent implementation, inspection, unanticipated duration, cost and quality. Conversely author makes us aware about application advantages of BIM technology such as 3D model, model’s integration, model association, management of information, etc. Paper also provides us with BIM application value by referring the report made by Dodge data and analytics, which tracks the impact of technological progress on enterprise via the “smart market”. And main findings of it considering Chinese design firms that currently use BIM and not yet applied are BIM application rate is increasing every year, BIM has capability to produce humongous commercial benefits, also currently non BIM using firms are optimistic as 89% of non BIM users in China were positive about it and none said they are not going to use it at all. Paper explains composition of 5D BIM model, including integrated 5D BIM model, 5D BIM model block. Authors’ considers case study of central grand view project as example as to how project works is the city of Zhengzhou City, Qiantang Road and Food Street Intersection Southeast corner. The author finally concludes that the application of BIM technology helps to perform the management of the planning schedule. Author explain us application of BIM with an example like, 3D scanning and printing technology how it can achieve replication and remodeling of building components with an application of energy-saving environmental protection materials. The use of Radio Frequency Identification (RFID) technology in construction projects are helpful in the management of input materials, the control of construction schedules and the management of operation and maintenance. B. Qiqi Lu, Jongsung Won, Jack C. P. Cheng (2016) claims that previous studies are based on cash outflow instead of cash inflow analysis and project financing. Paper methodology is divided into four steps- 1) BIM model generation, 2) Quantity Take Off extraction, 3) scheduling, 4) cost and schedule loaded with quantity take-off list integration. The paper very well elaborates the methodology with tables of 5D BIM framework. Paper described with two examples that although software like NAVISWORKS, COSTX, Vico-office can also integrate bill of quantity which schedule and Cost data without manual processing, they cannot accurately in analyze cash flow of an AEC project, as software assume that cash flows are continuous with respect to completion of activities but in actual practice there are many activities and tasks where personnel has to pay before actually availing the services, while A Review On Advanced Applications of BIM in Construction Field Omkar Patil 1* , Umesh Deshpande 2 1 M.Tech. Scholar, Department of Civil Engineering, Govt. College of Engineering, Karad, India 2 Associate Professor, Department of Applied Mechanics, Govt. College of Engineering, Karad, India *Corresponding author: onkarpatil05@gmail.com