International Journal of Innovative Technology and Exploring Engineering (IJITEE) ISSN: 2278-3075, Volume-8, Issue-10, August 2019 4238 Published By: Blue Eyes Intelligence Engineering & Sciences Publication Retrieval Number J99510881019/19©BEIESP DOI: 10.35940/ijitee.J9951.0881019 Abstract: To complete a project under the complicated situations, it is important to follow effective ways to use available tools and methods, taking into account present technology and management. Also, it is challenging to prepare accurate and achievable plans in large construction projects. Visualizing forms at an early stage in building design improves the ability of designers to deliver ideas and the capability to inspect and assess the methods helps to predict and optimize the actual presentation of the construction project. These different features form the basis for Building Information Modeling (BIM). The archetypal problems like budget overflow, lack of communication, cost overruns, overtime delays, rework can be minimized with the use of Building Information Modeling (BIM) tools for building design & resource management. In this paper, the concept of Building Information Modelling (BIM) is used for 3D modeling, which involves 4th dimension as Time (4D), 5th dimension of Cost (5D) of the project. A case study of G+5 residential apartment is presented for 3D BIM modeling and quantity take-off with the commercial software Autodesk Revit 2019. The 4D BIM carried out using Primavera P6 is explained with methodology for a case study. Further, Autodesk Navisworks Manage 2019 is used for 5D BIM, which includes a graphical presentation of the construction schedule and cost estimation of the case study. Keywords: Building Information Modelling (BIM), Construction Management, 3D BIM, 4D BIM, 5D BIM. I. INTRODUCTION BIM integrates various areas through effective communication, analyzes project system configurability, estimates project cost, and time whenever using quantitative take-off, draws a large picture of projects using visualization and creates a joint team. The BIM technology popularization is stimulating its application at every stage of the construction project life cycle. Construction managers or general contractors utilize BIM to comprise workloads to make cost estimates. Besides, they can create persuasive 3D renderings. Additionally, schedule integrated BIM known as 4D BIM is used for safety analysis, animations and to prepare logistic site plans. To coordinate the work with subcontractors efficiently, construction managers can use BIM. Also, project schedules of construction managers can have BIM updating. In conclusion, construction managers can provide an integrated BIM model to the maintenance team of the Revised Manuscript Received on August 05, 2019 Gaurav S. Narlawar, Civil Engineering Department, Government College of Engineering, Karad, Maharashtra, India. Dr. N. B. Chaphalkar, Civil Engineering Department, College of Engineering, Pune, Maharashtra, India. Dr. Sayali Sandbhor, Civil Engineering Department, SIT, Symbiosis International (Deemed University), Pune, Maharashtra, India. possessor. A. Scope of the Study The metropolitan cities in India have a large population with limited space for the construction of houses. The increasing demand for houses in the city can be minimized by the construction of residential apartments using advance techniques. The residential building projects find the subsequent problems during construction such as calculation of constructiveness and recognition of design conflicts before construction, inherently more complex nature due to errors in certification and approval, archetypal issues like budget overflow, lack of communication, cost overruns, overtime delays, rework. These problems can be minimized with the use of Building Information Modeling (BIM) tools for building design & resource management. So, the study on the schedule optimization of a resource-constrained construction project with BIM tools such as Autodesk Revit, and Autodesk Navisworks Manage is accomplished on a residential apartment in this research. The objectives of the proposed work are: To understand the importance of resource management in residential apartment construction. To study the features and benefits of Building Information Modelling (BIM) tools such as Autodesk Revit and Autodesk Navisworks Manage. To analyze the time & cost required for residential apartment construction with the 3D model using Autodesk Revit & Autodesk Navisworks Manage. B. Methodology for research The project work is started with the collection of data of residential apartment such as site details, drawings, schedule of works, etc. The following stages are involved in the work methodology of the research as shown in fig. 1: Time and Resource Management of Residential Apartment Construction using Building Information Modeling Gaurav S. Narlawar, N. B. Chaphalkar, Sayali Sandbhor