Environmental management system focus on Malaysia’s Langkawi Geopark Elmira Shamshiry 1 , Behzad Nadi + 2 , Mazlin Bin Mokhtar 1 , Ibrahim Komoo 1 , Halimaton Saadiah Hashim 1 , Nadzri Yahya 3 1 Institute for Environment and Development (LESTARI) Universiti Kebangsaan Malaysia (UKM), 43600 UKM BANGI, Selangor, Malaysia 2 Universiti Putra Malaysia, Institute of Advanced Technology (ITMA) 3 Director General, National Solid Waste Management Department, Ministry Of Housing and Local Government, Malaysia Abstract. Human activities towards development will have various effects on Environment any way. We couldn’t limit these activities, should try according to present and future needs for its development and completion, on condition that should not destroy environment and natural resources. In fact Environment and development are separately matters, it is necessary with application and using of Environmental Management tools in all of development program , minimum damaging enter to resources and Environment. Langkawi is administrative district and the town of Kuah is its capital and the largest town in it. The total land area of the islands is 47,848 hectares while Langkawi, which is the main island. Lafarge Malayan Cement is the leader in the Malaysian cement industry. In Malaysia, it operates a nationwide network of facilities which include three integrated cement plants in Langkawi, Kanthan, and Rawang, one grinding plant in Pasir Gudang, and distribution channels by road, rail, and sea. In this paper we want to show effect of Lafarge factory on Langkawi Island, Optimizing and recovering of factory existent Environmental situation, Removing Environmental problems and improvement relevant standards and Schematizing and controlling on Environmental safety preservation and preferment, decreasing of contaminated resource and Environmental planning arrangement and integration with utilizing Environmental Impact Assessment and Environmental Management System. Keywords: Environmental Management System, Langkawi Island, Effect 1. Introduction Primary object in Environmental assessment report preparation have confidence on policies observance and special goods in factory programs and activities base of criterion, standards, Environmental acts and regulations Environmental impact identification, prediction and assessment is one of accepted ways for reaching to sustainable development aims and could settle as one programming tool in available of programmers, managers and determinants until base on that could identify Environmental potentially impacts in developing refinery and logical alternatives select for its solution. Human activities towards development will have various effects on Environment any way. Consider to the effect of action in area and both of advantage and disadvantage of LAFARGE factory in island. Our success in obtaining International Standards Organization (ISO) 14001 certification in 2002 is one of the ways we have demonstrated that commitment. This environmental statement augments the ISO 14001 requirement for public reporting of our environmental performance. Performance data provided in this statement is based on the data available at the time the statement was generated. Where possible, 2005 data was used. Otherwise, 2004 data was used. Immediately following Rio,other institutions began focusing on *corresponding author. Tel. :(0060173577610). E-mail address: (nadibehzad@gmail.com). 108 2011 International Conference on Environment and Industrial Innovation IPCBEE vol.12 (2011) © (2011) IACSIT Press, Singapore