This article was downloaded by: [ ] On: 31 August 2011, At: 09:29 Publisher: Routledge Informa Ltd Registered in England and Wales Registered Number: 1072954 Registered office: Mortimer House, 37-41 Mortimer Street, London W1T 3JH, UK Construction Management and Economics Publication details, including instructions for authors and subscription information: http:/ / www.tandfonline.com/ loi/ rcme20 Factors influencing construction time and cost overruns on high-rise projects in Indonesia Peter F. Kaming, Paul O. Olomolaiye, Gary D. Holt & Frank C. Harris Available online: 21 Oct 2010 To cite this article: Peter F. Kaming, Paul O. Olomolaiye, Gary D. Holt & Frank C. Harris (1997): Factors influencing const ruct ion t ime and cost overruns on high-rise proj ect s in Indonesia, Const ruct ion Management and Economics, 15:1, 83-94 To link to this article: ht t p: / / dx. doi. org/ 10. 1080/ 014461997373132 PLEASE SCROLL DOWN FOR ARTICLE Full terms and conditions of use: http://www.tandfonline.com/page/terms-and-conditions This article may be used for research, teaching and private study purposes. Any substantial or systematic reproduction, re-distribution, re-selling, loan, sub-licensing, systematic supply or distribution in any form to anyone is expressly forbidden. The publisher does not give any warranty express or implied or make any representation that the contents will be complete or accurate or up to date. The accuracy of any instructions, formulae and drug doses should be independently verified with primary sources. The publisher shall not be liable for any loss, actions, claims, proceedings, demand or costs or damages whatsoever or howsoever caused arising directly or indirectly in connection with or arising out of the use of this material.