Electric Power Systems Research 151 (2017) 419–431
Contents lists available at ScienceDirect
Electric Power Systems Research
journal homepage: www.elsevier.com/locate/epsr
Review
Review of investment model cost parameters for VSC HVDC
transmission infrastructure
Philipp Härtel
a,∗
, Til Kristian Vrana
b
, Tobias Hennig
a
, Michael von Bonin
a
,
Edwin Jan Wiggelinkhuizen
c
, Frans D.J. Nieuwenhout
c
a
Fraunhofer IWES, Kassel, Germany
b
SINTEF Energi, Trondheim, Norway
c
ECN, Petten, The Netherlands
a r t i c l e i n f o
Article history:
Received 15 December 2016
Received in revised form 10 May 2017
Accepted 11 June 2017
Keywords:
Offshore grids
Transmission expansion planning
Cost model
HVDC
VSC
a b s t r a c t
Cost parameters for VSC HVDC transmission infrastructure have been gathered from an extensive collec-
tion of techno-economic sources. These cost parameter sets have been converted to a common format,
based on a linear investment cost model depending on the branch length and the power rating of cable
systems and converter stations. In addition, an average parameter set was determined as the arithmetic
mean of the collected parameter sets, and included in the study. The uniform format allowed for a compar-
ison of the parameter sets with each other, which revealed large differences between the cost parameter
sets. The identified disparity between the parameter sets reflects a high level of uncertainty which can
only in part be explained by a varying focus and modelling approach of their sources. This implies limi-
tations regarding the validity of the parameters sets as well as of the results from grid expansion studies
carried out on the basis of these parameter sets.
Comprehensive cost reference data has been collected from realised and contracted VSC HVDC projects
(back-to-back, interconnector, and offshore wind connection). The cost parameter sets have been eval-
uated against the reference project cost data. This evaluation has again shown large variations between
the parameter sets. On average, the cost for back-to-back systems are slightly underestimated, intercon-
nectors are overestimated, and offshore wind connections are heavily underestimated. To clearly state
the validity and limitations of this comparison and evaluation, the applied methodology with its compro-
mises and drawbacks is discussed in detail. Considering the interest in and momentum of offshore grid
development, as well as the number of offshore grid investment and evaluation studies being conducted,
both the availability of reliable cost reference data and the validity of investment model cost parameters
need continuing attention.
© 2017 Elsevier B.V. All rights reserved.
Contents
1. Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 420
2. Collected cost parameter sets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 421
3. Cost parameter set processing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 421
3.1. Cost model . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 421
3.2. Cost parameter set conversion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 422
3.3. Average parameter set . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 422
4. Comparison of cost parameter sets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 422
4.1. Branch cost parameters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 422
4.2. Node cost parameters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 423
4.3. Offshore cost parameters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 423
5. VSC HVDC projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 423
∗
Corresponding author.
E-mail address: philipp.haertel@iwes.fraunhofer.de (P. Härtel).
http://dx.doi.org/10.1016/j.epsr.2017.06.008
0378-7796/© 2017 Elsevier B.V. All rights reserved.