Jurnal Arsip Rekayasa Sipil dan Perencanaan 1(4),22-29 (2018)
DOI: 10.24815/jarsp.vlil.12471
22
ANALISA SKALA PRIORITAS PROYEK PEMBANGUNAN JALAN DI
KABUPATEN ACEH JAYA
Rahmad Fuadi
a *
, Muhammad Isya
b
, Renni Anggraini
c
a
Magister Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala, Banda Aceh
b,c
Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala, Banda Aceh
*Corresponding author, email address: rahmadalfaedison@gmail.com
A R T I C L E I N F O A B S T R A C T
©2018 Magister Teknik Sipil Unsyiah.All rights reserved
1. PENDAHULUAN
Kabupaten Aceh Jaya adalah salah satu Kabupaten yang berada di provinsi Aceh yang
merupakan Kabupaten pemekaran dari Kabupaten Aceh Barat. Sebagai Kabupaten baru tentunya di
Kabupaten Aceh Jaya masih sangat minim sarana dan prasarana penunjang sosial ekonomi masyarakat,
sehingga pemerintah Kabupaten Aceh Jaya saat ini terus melakukan berbagai pembangunan struktur dan
infrastruktur demi terwujudnya kemajuan Kabupaten Aceh Jaya ke depan.
Keterbatasan dana pemerintah kabupaten Aceh Jaya untuk pembangunan, termasuk pembangunan
infrastruktur jalan serta cara penentuan proyek pembangunan yang masih belum tepat dan proses
penganggaran paket pekerjaan yang kurang proporsional oleh pemerintah Aceh Jaya sendiri
menyebabkan belum bisa terpenuhinya seluruh kebutuhan pembangunan jalan baik itu pembukaan jalan
Jurnal Arsip Rekayasa Sipil dan Perencanaan (JARSP)
Journal of Archive in Civil Engineering and Planning
E-ISSN: 2615-1340; P-ISSN: 2620-7567
Journal homepage: http://www.jurnal.unsyiah.ac.id/JARSP/index
Keywords:
Road Infrastructure, Multi Criteria
Analysis, Criteria Weight, Score,
Priority.
The limited funding of the Aceh Jaya regency government for
development, including the construction of road infrastructure and the
way in which road construction projects are still inaccurate and the
process of budgeting unproportional work package by the Aceh Jaya
regency government itself has not been able to fully meet the needs of
road development in Aceh Jaya. Therefore, the need for priority scale
that can be used as the basis of consideration in the process of
development of road infrastructure development program. The purpose
of this study is to determine the priority order of several road
infrastructure development projects in Aceh Jaya regency by selecting or
considering the appropriate criteria and according to development
condition in Aceh Jaya regency using Multi Criteria Analysis (MCA)
method. The weight of each criterion was calculated based on an
assessment of the importance between the criteria obtained by
interviewing stakeholders in Aceh Jaya regency government, while the
alternative road performance score was obtained by analyzing and
calculating the scale of the assessment quantitatively against each
criterion based on secondary data obtained from related offices. Selected
criteria are accessibility, environmental aspect, area development aspect,
social aspect and development cost. Social aspect criteria get the highest
weight of 0.279, it can be interpreted that social aspect is the main
consideration in determining priority of road development in Aceh Jaya
regency, because social aspect see influence of economic growth and
social welfare of society from development of road infrastructure. Based
on the consideration of these criteria, the order of priority scale of road
construction project in Aceh Jaya regency, where road in Calang city,
Krueng Sabee sub-district is the first priority with score value 6,72.
Article History:
Received 06 August 2018
Received in revised form 04 Oktober 2018
Accepted 09 October 2018