E-Journal SPEKTRUM Vol. 5, No. 2 Desember 2018 Wayan Wijana, I Ketut Wijaya, I Made Mataram 61 ANALISIS KOORDINASI RELAY ARUS LEBIH (OCR) DAN RECLOSER PADA SISTEM EKSISTING PENYULANG BUKIT JATI Wayan Wijana 1 , I Ketut Wijaya 2 , I Made Mataram 3 Program Studi Teknik Elektro, Fakultas Teknik, Universitas Udayana Denpasar – Bali Email : wijana.deb@gmail.com 1 , wijaya@ee.unud.ac.id 2 , mataram@ee.unud.ac.id 3 Abstrak Sistem proteksi berperan penting untuk menjaga keandalan saluran distribusi. Over current relay (OCR) merupakan salah satu peralatan yang digunakan sebagai pengaman saluran distribusi 20 kV. Penyulang Bukit Jati dilengkapi peralatan proteksi over current relay yang terpasang di recloser Banda dan relay penyulang di Gardu Induk (GI). Berdasarkan data PT. PLN (Persero) APD Bali, terdapat 5 kali gangguan hubung singkat yang salah satunya menyebabkan penyulang Bukit Jati trip. Permasalahan kegagalan koordinasi over current relay dapat diatasi dengan menganalisis koordinasi sistem proteksi yang terdapat pada penyulang Bukit Jati. Analisis dilakukan dengan cara menghitung ulang setting over current relay dan membuat kurva koordinasi setting eksisting serta membandingkannya dengan kurva koordinasi setting sesuai hasil perhitungan. Hasil perhitungan setting ulang arus instant recloser di peroleh sebesar 1.246 A dengan time multiple setting (Tms) 0,11 sedangkan nilai setting arus instant penyulang sebesar 2.992 A dengan Tms 0,38. Berdasarkan hasil simulasi menggunakan program ETAP diketahui koordinasi over current relay sudah bekerja sesuai zona proteksi yakni saat terjadi gangguan di belakang bus recloser tidak mengakibatkan penyulang trip. Kata Kunci : Over Current Relay, Recloser, Proteksi Abstract Protection systems play an important role to maintain the reliability of distribution line. Over current relay (OCR) is one of the equipments used as a protection line of 20 kV distribution. Feeder of Bukit Jati is equipped over current protection relay equipment installed in Recloser of Banda and relay in the substation feeder. Based on the data of PT. PLN (Persero) APD Bali, there are 5 time-short circuit disorders which one of them tripped the Bukit Jati feeder. Problems over current relay coordination failures can be overcome by analyzing the coordination of protection systems in the feeder of Bukit Jati. The analysis was done by recalculating the over current relay setting and create the coordination curve of the existing setting and compared it with the coordination curve setting according to the calculation result. The results of the calculation of instant recloser recycling settings obtained by 1.246 A with time multiple setting (Tms) of 0.11 while the value of the instant current setting of the feeder of 2.992 A with Tms of 0.38. Based on the simulation result using ETAP program, it is known that over current relay coordination has worked according to the protection zone when the noise occurrence behind the recloser bus did not result in a trip feeder. Keywords: Over Current Relay, Recloser, Protection 1. PENDAHULUAN Penyulang Bukit Jati merupakan jaringan distribusi 20 kV dengan konfigurasi sistem radial yang terbagi menjadi dua zona proteksi. Sistem proteksi pada penyulang dilengkapi over current relay (OCR) yang terpasang pada recloser Banda sebagai pengaman Zona 2 serta satu buah relay penyulang di gardu induk sebagai pengaman Zona 1[1]. Berdasarkan data yang diperoleh dari PT. PLN (Persero) APD Bali, pada bulan Januari – Juni 2017 terjadi 5 kali gangguan hubung singkat yang salah satunya mengakibatkan penyulang Bukit Jati lepas/trip [2]. Kegagalan koordinasi proteksi