Copyright © 2018 Marwan Lubis. This is an open access article distributed under the Creative Commons Attribution License, which permits
unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
International Journal of Engineering & Technology, 7 (2.13) (2018) 385-388
International Journal of Engineering & Technology
Website: www.sciencepubco.com/index.php/IJET
Research Paper
The Analysis Effect of Traffic Acces at AH. Nasution and STM
Street
Marwan Lubis
1
, Darlina Tanjung
1
, Hamidun Batu Bara
1
, M. Husni Malik Hasibuan
1
, Abdurrozzaq Hasibuan
2
1
Department of Civil Engineering, Faculty of Engineering, Universitas Islam Sumatera Utara, Medan, Indonesia
2
Department of Industrial Engineering, Faculty of Engineering, Universitas Islam Sumatera Utara, Medan, Indonesia
*Corresponding author E-mail: Azmi.rizki@ft.uisu.ac.id
Abstract
The impact of the construction of an activity center will create awakening and attraction traffic and also increase negative
impact to the flow of traffic access, safety, comfortable to pedestrian, the surrounding will be influenced by building
development or building activities. The analysis result has been done is know the V/R ratio of street especially at segment 4
in 2019. The ratio of the service indicators is at level E. Instability condition of the traffic access that often stop with the
average speed of the vehicle about 28.5 km/h, while the volume road performence in 2024 or after the student’s building
has operated about 5 years was predicted the service indicators is at level F, its mean forced flows or jammed, low speed
capacity and long vehicle and became a big obstacle, while another access is at e level especially at segment 2 for A H
Nasution access and segment 3 at STM street access.
Keywords: Traffic Access, Awakening and Attracrion Traffic
1. Introduction
The traffic congestion problem will disadvantage of traffic’ user
like waste fuel and spend much time on the way. To minimize this
problem, its better to do the analysis of traffic impact to
construction, some center activities especially something that
giving important effect to city street access system which
correspanding permen no 75 2016[1], [2]. The impact of center
activities building will cause awakening and attraction traffic, so it
can burdening and influencing social human life and of course will
give negative impact to:
1. Smoothness traffic not only for motor vehicle but also
pedestrian.
2. Pedestrian’ safety will be distrub resulting from rise of traffic
flow.
3. The comfortable of the road’s user is related the decrease of
the speed vehicle, the increase of noise and the decrease of the
air quality due to the exhaust generated by the rise of traffic
flow to the development.
4. The endurance declining street, which is caused by burdening
traffic on type and amount of motor vehicle which is passed
on the street and also for the construction of street pavement.
5. A viewing from an object of traffic will influence a viewing
disturbance of one side to another side of the road section
Some analysis that must be done are existing and predicting of
traffic condition in the future by predicting amount of awakening
spreading and burdening trip in the future and also evaluate the
negative effect which is caused by its building it self[3].
Purpose And Goal
This research is expected to provide problem solving, alternative
that might be inflicted like :
1. To evaluated the extend to which the impact are generated by
the growth of development and activities that like medicinal
activities of UISU, shop in Medan city especially at STM
street.
2. To minimize the effect that might be caused by the activities
of UISU medical faculty.
The Reseach Scope from this area,especially area that has
predicted has influence by there are some activities of medical
faculty in UISU at STM street,the scope are[4], [5] :
Area’s survey is used to get this condition like:
a. The field survey to get that moment condition are:
Classified traffic survey at intersections and road segments.
Survey of vehicle average speed
b. The activies location
The activities location is focused to road segment that is
included in the area of road area which will be estimated the
impact of campus activities at STM street.
There are some analysis steps to reach the goals
a. Working preparation
b. Doing survey
c. Identifying problems
d. Giving some indicative ideas to the problems
2. Methodology
Transportation need in Medan city now days are increasingly are
combined by an increasing better economy. there are many private